Separate investment and production costs
The initial investment and the manufacturing cost per part are separate questions. The machine, pump, head and options determine the initial investment; operating costs depend on the specific application and usage.
The same machine can have different costs per part for workpieces with different thicknesses and geometries. The machine price therefore cannot establish a general cutting cost in HUF per minute or metre.
Which costs should you include?
| Cost element | What to measure or discuss |
|---|---|
| Abrasive | Consumption needed to produce a part of the required quality. |
| Energy and water | Actual operation of the selected configuration and local utility rates. |
| Consumable parts | Head, nozzle, seals and the specific machine's maintenance requirements. |
| Labour time | Programming, loading, cutting, inspection and finishing. |
| Downtime | Maintenance, sourcing, troubleshooting and spare capacity. |
| Material and waste | Sheet utilisation, rejected parts and spent abrasive handling. |
Include the quality target
A faster cutting setting can reduce machine time, but may affect edge quality and the finishing work needed. The economical choice follows from the finished part requirements.
Specify tolerance, surface finish and permitted finishing work as carefully as material and thickness. This prevents quotations from comparing results of different quality.
A simple calculation framework
Cost per part = direct material and consumables + energy and water + labour + the allocated machine, maintenance and waste-handling cost.
This is a calculation framework, not a price estimate. Each item needs measured data or figures confirmed for the specific configuration. Allocate rejects and preparation time across the realistically saleable quantity.
Details to include when asking about costs
Send a drawing or geometry description, material grade, thickness, quantity, tolerance and edge quality target. For machine purchasing, the shift pattern and planned product mix also matter.
Update the comparison table with actual operating data over time. This shows where a process or purchasing change produces a measurable benefit.